The Project
Summerset Landing is a modern retirement living development in the heart of Kenepuru, offering a mix of villas, cottages and apartments.
The Requirement
During the bulk earthworks portion of the project a significant amount of dirt was tracking onto the busy streets of Porirua, not only causing an environmental and safety issue, but providing a bad image for Summerset and the contractors working on the site to the surrounding neighbourhood.
The Solution
Rapid Earthworks approached Condor for a solution to this issue as the existing short wash platform wheel wash system wasn’t sufficient for the clay soiling and truck volumes the site was having to manage.
A MobyDick 400B Wheel Wash System was recommended by Condors team due to it having a full 4 metre wash platform providing a full tyre rotation and an optimum wash result.
The system has a full 20mᶟ water recycling tank meaning minimal top up water was required.
The Result
The Wheel Wash System was delivered to site and Condor staff oversaw the installation.
By keeping the dirt off the roads and surrounding stormwater catchments the end result was there was minimal environmental impact to the surrounding stormwater network and the roads were kept safe.
Contractor: Rapid Earthworks
Client: Summerset
Products used: MobyDick 400B Wheel Wash System
Location: Kenepuru, Wellington
Think of Condor as your Environmental Compliance Partner.
Our team works hard to understand the challenges you face. We go further to ensure the solutions we provide are fit for purpose and will comply with local environmental regulations so you can get on with the task at hand.
These systems are available for hire, lease or purchase New Zealand wide. Contact us on 0508 044 055 to discuss your site requirements.
Comments