top of page
Dewatering Support for Christchurch Infrastructure Project
Contractor: Issacs Construction
Client: Christchurch City Council
Location: Christchurch

When Isaacs Construction tackled a sewer main installation for Christchurch City Council - 4-metre deep trenches, water table at 2 metres, tight urban conditions - they needed dewatering equipment that performed and a supplier that showed up when it counted.
Condor supplied pumps, hoses, and silt trap filters that ran quietly, efficiently, and without interruption. But it was the response time that stood out. When something went wrong on site - and it was usually a Friday afternoon - Condor was there within the hour.
Hear directly from the Isaacs team about what that kind of service means on a live council project.
bottom of page
