The Project


Te Ara o Te Ata – Mt Messenger Bypass seeks to provide vastly enhanced road safety, durability, and traveling experience. The bypass consists of an entirely new 6km pathway from Uruti to Ahititi that circumvents the current steep, narrow, and winding path over Mt Messenger on State Highway 3.

It comprises two bridges measuring around 125m and 30m in length, along with a 235m tunnel. The route will be situated at a lower elevation and have a gentler slope compared to the existing road.

A significant program of environmental restoration and pest management covering 3,650 hectares is also a pivotal aspect of the project.


The Requirement


With the construction site running through steep natural vegetation the environmental aspect of the project provided significant challenges.

Multiple streams needed to be diverted and the high pH water from the tunnelling process needed a robust solution.

The Solution


The team played a significant part in the over pumping, and with the requirement of the pumps having to be airlifted into place there were strict weight limitations. Condor sourced and supplied specific pumps for this unique application.

Condor supplied multiple systems for the different water management challenges faced onsite, from treating TSS from construction activities, treating high pH water, along with real time water quality management systems.

With Condor offering both hire and purchase options, this offered flexibility to the team at Mt Messenger to purchase equipment that would be used for the duration of the project, yet offer short term hire for specific items providing the most efficient use of resources and ultimately reduce project cost.


Contractor: Downer and HEB Construction


Consultants: Tonkin & Taylor and WSP


Client: NZ Transport Agency Waka Kotahi


Products used: 3 x Condor XXL Water Treatment Systems, 1 x Condor Hydrodem pH control system, Clarity by Condor real time monitoring, multiple chemical mixing and buffer tanks, 6 x Atlas Copco PAS150 open set dewatering pumps.


Location: Mt Messenger, Taranaki, New Zealand


Think of Condor as your Environmental Compliance Partner.

Our team works hard to understand the challenges you face. We go further to ensure the solutions we provide are fit for purpose and will comply with local environmental regulations so you can get on with the task at hand.





These systems are available New Zealand wide. Contact us on 0800 115 478 to discuss your site requirements.



 
 
 

Comments


Condor Civil_Landscape_Condor Grey._No R.png

Freephone 0800 115 478

  • Facebook - Grey Circle
  • YouTube - Grey Circle
  • LinkedIn - Grey Circle

AUCKLAND 

(By Appointment)

15 Rakino Way

Mount Wellington 1060

New Zealand

WELLINGTON

24/26 Downer St

Lower Hutt 5010

New Zealand

CHRISTCHURCH 

(By Appointment)

7 Abros Place

Burnside 8053

New Zealand

©2023 Condor New Zealand Limited | All rights reserved

bottom of page