top of page

Explore our Projects and Industry Insights
Discover How Our Innovative Solutions Bring Efficiency, Sustainability, and Success to Every Project


Safety in Action: Trench Shoring on the Seaview Energy Resilience Project
Undertaking significant pipeline installation work as part of this multi-year project. The work involves deep trenching for underground fuel infrastructure, requiring robust safety systems to protect workers while they install this vital energy supply network.
Nov 4


Paekākāriki Hill Road Slip Repair: Award-Winning Stream Bank Protection & Water Treatment
When a slip on Paekākāriki Hill Road created urgent safety concerns around road instability, Porirua City Council needed a swift and effective solution. Condor partnered with SBA Civil to provide the water treatment solution needed to protect the stream environment.
Oct 14


Why UINZ Chooses Condor Civil for Dewatering Solutions
UINZ needed a reliable dewatering partner in Canterbury who could provide comprehensive pump hire and sediment tank solutions while helping them meet strict environmental compliance standards for water treatment and discharge during pipeline and HDD projects.
Sep 16


Kourarau Dam Dewatering Project
The challenging conditions at Kourarau Dam required a robust and reliable pumping solution capable of handling high water levels and debris-laden water. The system needed to operate effectively across changing weather conditions.
Jun 24


Firth Concrete Bespoke Wheel Wash
A bespoke system was designed featuring a flush drive on drive off system, in ground magnetic sensors at the entrance and exit, providing washing for outgoing trucks only, and a full in ground water recycling tank.
Apr 21


Te Ara o Te Ata – Mt Messenger Bypass
Condor supplied multiple systems for the different water management challenges faced onsite, from treating TSS from construction activities, treating high pH water, along with real time water quality management systems.
Apr 20


Porirua Central Wastewater Retention Tank
This project is crucial in ensuring a healthier harbour and coastal environment by reducing the amount of untreated wastewater that enters the network.
Apr 6


Te Aranga Alliance - Eastern Porirua Development
This project is crucial in ensuring a healthier harbour and coastal environment by reducing the amount of untreated wastewater that enters the network.
Jul 8, 2024


The Seaview Energy Resilience Project
This project is crucial in ensuring a healthier harbour and coastal environment by reducing the amount of untreated wastewater that enters back into the waterways.
Sep 21, 2022


Let the Pumps Look After the Project
The requirement was to have any dewatering onsite to take care of itself so the Brian Perry Civil, Fletcher Construction crews and subcontractors could have a well-deserved break.
Dec 16, 2021


T&T Wheel Wash Project: Landfill Compliance
With a significant amount of truck movements per day a lot of dirt was tracking onto the streets, Condor provided the solution of a MobyDick Wheel Wash.
Dec 1, 2021


Wellington Town Hall Strengthening Project: Water Treatment
March Construction and Naylor Love engaged Condor to supply a turn-key water treatment system to assist with meeting the council discharge consent requirements.
Nov 30, 2021


James Line Urban Development Pond Dewatering
Condor was faced with the task of dewatering a heavily sediment-laden 11,000mᶟ pond to a suitable standard to discharge directly to the stormwater network.
Nov 30, 2021


Quarry Spec Dust Suppression Units
When Brookby Quarries had issues with dust, they approached Condor for a solution that would meet the demands of their site. The Solution, a TTi Water Cart.
Nov 9, 2021


NPD Fuel Palmerston North
PSL approached Condor to supply a turn-key water treatment and drainage package to assist with meeting the council discharge consent requirements.
Nov 8, 2021


Summerset on the Landing: Wheel Wash
During the bulk earthworks portion of the Summerset Landing project, a significant amount of dirt was tracking onto the busy streets of Porirua. Condor assisted with a MobyDick Wheel Wash as the solution.
Nov 5, 2021


Waikato 50 Water Treatment Project
With the requirement of filling in a large sediment retention pond to enable further works, Condor was contacted to provide an alternative solution to assist with the removal of suspended solids to meet water discharge consent requirements.
Sep 15, 2021


Fulton Hogan Petone to Melling Cycleway Underpass
Condor was approached by Fulton Hogan to assist with the removal of suspended solids, which would affect the water quality discharged during the construction of two rail underpasses.
Jan 19, 2021


Fulton Hogan Te Pahu Road Project
Condor was approached by Fulton Hogan to assist with ensuring the water quality discharged into the Waikoha stream bridge was in accordance with the expectations of the project during bridge strengthening works in Te Pahu, Waikato.
Aug 11, 2020


March Construction Project Hamilton
Our Condor Sand Trap WTS unit was recommended for this project with a lamellar clarifier, along with our industry-leading hydrocarbon filter pads which the hydrocarbons will adhere and let water drain through.
May 19, 2020
bottom of page