top of page

Condor Chemical Treatment Management Plan

HIRE - PURCHASE - LEASE

For the projects that require a CTMP, to ensure compliance with sediment discharge standards.

The Condor CTMP: Assisting you in Environmental Compliance.

The criteria is normally stipulated by the council undertaken in, that a CTMP is required prior to the commencement of works on any given site.

Covers:

  • The type of work being undertaken

  • Location

  • Client

  • Bench Testing Results from the soil sample to collate the optimum chemical dose rates

  • The methodology

  • Any required maintenance and risk contingency plans

Condor undertakes bench testing of samples within our own in house laboratory. Results provided typically include Clarity, Total Suspended Solids (TSS), Turbidity (NTU), pH, heavy metals and arsenic values and are also documented and described in detail in CTMP.


Condor Civil's Submark Logo in Green

Contact Us to Discuss How This Could Be Suitable for Your Project

  • Page 1

Explore More

1720748804699.jpg
Condor pH Correction Units
1720748804699.jpg
Condor XXL Water Treatment System
1720748804699.jpg
Condor Sand Trap
bottom of page