When a slip on Paekākāriki Hill Road created urgent safety concerns around road instability, Porirua City Council needed a swift and effective solution. SBA Civil was tasked with the critical repair work, which required careful stream bank protection that balanced construction urgency with environmental responsibility.
The project's success has been recognised with SBA Civil securing the Civil Contractors Project of the Year award (valued under $600,000). They delivered this complex repair ahead of schedule in just 13 days, despite multiple rain events, while maintaining single-lane traffic access throughout.
Condor partnered with SBA Civil to provide the water treatment solution needed to protect the stream environment while managing high flows during intensive construction operations.
The Water Treatment & Dewatering Challenge
Paekākāriki Hill presented demanding conditions. Variable flow rates, multiple rain events, and a compressed 13-day timeline meant the pumping and water treatment system had to perform flawlessly. Any sediment discharge into the stream would compromise both environmental compliance and the project's tight schedule.
The equipment needed to deliver consistent flocculation across changing weather conditions and flow volumes, ensuring stream health was never compromised, regardless of operational demands.
The Solution: High-Performance Pumping & Water Treatment
Condor deployed our 6-inch dewatering pump integrated with our XXL Water Treatment System. The equipment exceeded expectations, maintaining excellent flocculation even at very high flows and capturing sediment before any discharge could reach the stream.
Our system's performance was critical to SBA Civil's award-winning delivery. Outstanding water quality results throughout the 13 days meant the stream remained protected from erosion and sediment impact, even as rain increased drainage demands. This reliability allowed the contractor to meet their accelerated timeline while exceeding environmental standards.

The Equipment: Advanced Water Treatment Systems for NZ Construction
Our Water Treatment Solutions combine powerful pumping capacity with sophisticated flocculation technology for reliable sediment removal across varying site conditions. High flow rate efficiency, even during adverse weather, makes them ideal when water quality is a non-negotiable.
The 6-inch pump configuration delivers the capacity that demanding civil construction applications require. Integrated treatment ensures compliance with strict discharge standards and regional council requirements. One solution handles both water management and environmental protection, freeing contractors to focus on their core work.
Our team takes time to understand your unique challenges across New Zealand. We ensure our solutions are fit for purpose and will meet local environmental regulations, so you can get on with the job at hand.
These dewatering and water treatment systems are available nationwide. Contact us to discuss your site requirements in Wellington, Porirua, or anywhere across New Zealand.