top of page

Explore our Projects and Industry Insights
Discover How Our Innovative Solutions Bring Efficiency, Sustainability, and Success to Every Project


Environmental Compliance NZ: Protecting Your Civil Contractor Reputation in 2025
Councils took 6,546 enforcement actions in 2023/24, up 60% since 2017/18. For civil contractors, environmental compliance isn't just about avoiding fines, it's about protecting the reputation that took decades to build.
Jun 17, 2025


Firth Concrete Bespoke Wheel Wash
A bespoke system was designed featuring a flush drive on drive off system, in ground magnetic sensors at the entrance and exit, providing washing for outgoing trucks only, and a full in ground water recycling tank.
Apr 21, 2025


Te Ara o Te Ata – Mt Messenger Bypass
Condor supplied multiple systems for the different water management challenges faced onsite, from treating TSS from construction activities, treating high pH water, along with real time water quality management systems.
Apr 20, 2025


Porirua Central Wastewater Retention Tank
This project is crucial in ensuring a healthier harbour and coastal environment by reducing the amount of untreated wastewater that enters the network.
Apr 5, 2025


Te Aranga Alliance - Eastern Porirua Development
This project is crucial in ensuring a healthier harbour and coastal environment by reducing the amount of untreated wastewater that enters the network.
Jul 8, 2024


The Seaview Energy Resilience Project
This project is crucial in ensuring a healthier harbour and coastal environment by reducing the amount of untreated wastewater that enters back into the waterways.
Sep 21, 2022


Let the Pumps Look After the Project
The requirement was to have any dewatering onsite to take care of itself so the Brian Perry Civil, Fletcher Construction crews and subcontractors could have a well-deserved break.
Dec 15, 2021


T&T Wheel Wash Project: Landfill Compliance
With a significant amount of truck movements per day a lot of dirt was tracking onto the streets, Condor provided the solution of a MobyDick Wheel Wash.
Nov 30, 2021


Wellington Town Hall Strengthening Project: Water Treatment
March Construction and Naylor Love engaged Condor to supply a turn-key water treatment system to assist with meeting the council discharge consent requirements.
Nov 29, 2021


James Line Urban Development Pond Dewatering
Condor was faced with the task of dewatering a heavily sediment-laden 11,000mᶟ pond to a suitable standard to discharge directly to the stormwater network.
Nov 29, 2021
bottom of page
